Navy Pier Flyover

Enhancing Chicago's Lakefront Trail

FAQ

FREQUENTLY ASKED QUESTIONS

What is the Lakefront Trail?
The Lakefront Trail is an 18.5-mile bike and pedestrian trail along Lake Michigan that goes from Hollywood Avenue on the north end to 71st Street on the south end. The scenic path runs along parks, beaches and gardens in several neighborhoods throughout the City.

Why is it called the Navy Pier Flyover?
The term refers to the user’s uninterrupted ability to travel over the Chicago River, DuSable Park, the Ogden Slip, Illinois Street, Grand Avenue, Jane Addams Park and the Ohio Street Tunnel.

Why is a Flyover needed?
The Flyover will provide grade separation at Illinois Street and Grand Avenue for the Lakefront Trail. It will reduce crossing conflicts between the multi-use path users and cars going to and from Navy Pier area.

How high is the Flyover path?
The top of the path will be generally at the height of the existing mid-level Lake Shore Drive. While separate and protected from Lake Shore Drive, the path is intended to remain as close to Lake Shore Drive as possible and provide a low profile.

How wide is the Flyover path?
The Flyover path is 16 feet wide, adding capacity to the existing path, which will remain open and available for use.

Will there be roadway lane closures?
Yes. Current lane closures include:

  • Through Fall 2021, there will be permanent lane closures on Lower Lake Shore Drive including:
    • The west sidewalk over the river
    • The two easternmost, northbound lanes on Lower Lake Shore Drive over the river
    • Access to Illinois Street and Grand Avenue from the northbound lanes of Lower Lake Shore Drive will be restricted, and a detour will be set up to Columbus Avenue.

Updates will be provided through CDOT traffic alerts and the project website. Continue to visit this website throughout the project to help plan your trip accordingly.

When will the Flyover be completed?
The full Navy Pier Flyover structure is slated for completion by the end of 2020. The revised completion date is in response to extensive additional repairs being conducted on the Depression-era Lake Shore Drive bridge over the Chicago River. Handling these repairs now will ensure the safety of those using the Flyover and the adjoining Lake Shore Drive bridge in the years to come.

Is part of the Navy Pier Flyover open?
Yes!  As of February 1, 2021 the entire Navy Pier Flyover structure is open and the east sidewalk over the Chicago River has been opened.  This means pedestrians and bikers will no longer have to cross the two busy roadways.

Can pedestrians and bikes still use the Lakefront Trail path during construction?
Pedestrians and bikes can continue to use the Lakefront Trail path near Navy Pier, though width restrictions will be in place as construction is completed.

Will the Flyover be lit?
While a majority of the path will be lit from the ambient light of Lake Shore Drive, there will also be a system of LED lights built into the railing to provide an even glow for the path. Other LED lights will provide architectural lighting for the railing, columns and spine.

Who will maintain the Flyover once it’s complete?
The Chicago Park District, a non-participatory co-sponsor, will maintain the path.

Why is the Flyover structure so complex?
The new steel structure includes a spine, like a roller coaster, which will achieve a smooth and complex horizontal and vertical alignment necessary to clear an existing Lake Shore Drive off-ramp, as well as area structures.

What color is the coating on the steel structure?
The color of the structural steel will be grey.

Will construction be noisy?
There will be minor excavation and pile-driving operations resulting in high noise levels. Other noisy operations will include Lake Shore Drive saw-cutting and structure removal and excavation associated with the ramp that will run adjacent to the Lake Shore Drive off-ramp to Navy Pier. However, the contractor will have limited permitted work hours and no weekend hours unless specifically permitted during the summer season.

Will trees be removed as part of this project?
Yes, there will be trees removed on Illinois Street and in Jane Addams Park to make way for the Flyover. However, the contract requires an extensive tree replacement and landscape plan which will be completed at the end of the project.

Who can I contact with questions about construction?
You can email questions to [email protected] or call 312-464-0241. You can also connect with CDOT on social media: @ChicagoDOT and facebook.com/cdotnews.